THEORETICAL AND EXPERIMENTAL STUDIES OF THE CALCULATION OF THE TIME SPENT ON THREAD AND YARN FILLING ON A SEWING MACHINES


Iroda Kurbanova, Dilafruz Djalolova
Doctoral student , Bukhara Engineering Technological Institute
Abstract
In this article, a special device design has been developed to prevent the time spent sewing the item on the sewing machine, the time spent filling the yarn, and the excess electricity used to fill the yarn. It was found that when filling the shuttle tube to the thread, the machine is stopped and after the thread is filled, it takes 2-2.5 minutes for the sequence of operations to be carried out, which saves time and increases productivity by 1.5 times. In this article, a special device design has been developed to prevent sewing on the sewing machine, the time required for sewing, and excessive energy consumption of the yarn. It was found that the machine is interrupted due to threading, and after the completion of the thread, it takes about 2-2.5 minutes to complete the machine, which improves productivity by 1.5 times.
Keywords: Sewing machine, strut, needle, needle mechanism, thread, tube, body hose, mock, tube.
Journal Name :
EPRA International Journal of Research & Development (IJRD)

VIEW PDF
Published on : 2021-04-16

Vol : 6
Issue : 4
Month : April
Year : 2021
Copyright © 2024 EPRA JOURNALS. All rights reserved
Developed by Peace Soft